Prison Des Patriotes

Location
905 De Lorimier, Montreal
Project Dates
July 2017 to the spring of 2018
Years of Construction
1840
Project Details
  • Numbering and identifying of the locations of stones in the wall before dismantling.
  • Coordinating and assistance for archaeologists so they can carry out their dig and survey.
  • Sorting and cutting existing stones.
  • Injection work in the section of the wall located below ground level.
  • Structural reinforcement using stainless steel rod inserts.
  • Reconstructing the wall with reclaimed materials and incorporating new stones.
  • Covering the top of the wall with wood framing and a Patina-type stainless steel flashing from Uginox.

Get in touch with us today